CDN_S4 Posted August 20, 2014 Share Posted August 20, 2014 Can you pm me your paypal address again? Sent from Tapatalk Link to comment Share on other sites More sharing options...
fleurys Posted August 20, 2014 Author Share Posted August 20, 2014 Can you pm me your paypal address again? Sent from Tapatalk Send me your info ( either in pm or at steve_fleury3-at-yahoo.com ( name, address and email address) , and i.ll send you a paypal invoice for the deposit. Tks. Link to comment Share on other sites More sharing options...
01Pathmaker Posted August 20, 2014 Share Posted August 20, 2014 So if S4 is in, that makes only 1 more to go, correct? I've been going back and forth since you posted this up, I'll make a decision by the end of the weekend, but thinking it's likely. Link to comment Share on other sites More sharing options...
bushnut Posted August 20, 2014 Share Posted August 20, 2014 do it...we know you wanna. nothing like a little peer pressure to get the ball rolling. Link to comment Share on other sites More sharing options...
fleurys Posted August 20, 2014 Author Share Posted August 20, 2014 So if S4 is in, that makes only 1 more to go, correct? I've been going back and forth since you posted this up, I'll make a decision by the end of the weekend, but thinking it's likely. Well, I have technically 6 people interested. Just waiting on the 6th to pay the deposit. If you want to come aboard, go ahead and i'll add your name for the second batch of skids.. s. 2 Link to comment Share on other sites More sharing options...
Rebelord Posted August 20, 2014 Share Posted August 20, 2014 (edited) Here's a push for you guys. I have the AC skid plate for the front. Was pretty much given to me. It's 3/16" steel. It is freaking HEAVY! So much, that I dread dropping it to change my oil filter. So, for those of you on the fence. Grab this while you can. If your worried about cost. Here's my perspective. A sheet of 1/4" alum the size to make this is about $90 where I live. Then you have to find someone with a metal brake to make the bends, and hope you get them right. Then you have to spend the time to drill the holes. Which being slotted will make installing this super easy. (Compared to having to hold up 50lbs and hope you get the bolts started enough and fast enough with the heavy AC one). Finally you have to get it powder coated. Which will be $75+ and hope that the powder coater is doing a run. Otherwise you'll wait for it. Most wont do a single oven run just for a small skid like this. This is a good deal. Jump on it!! Edited August 20, 2014 by Rebelord Link to comment Share on other sites More sharing options...
Quaintbucket Posted August 21, 2014 Share Posted August 21, 2014 Whoo hoo! Sent from my iPhone using Tapatalk Link to comment Share on other sites More sharing options...
Quaintbucket Posted August 21, 2014 Share Posted August 21, 2014 Wish I could have a special colour haha Sent from my iPhone using Tapatalk Link to comment Share on other sites More sharing options...
fleurys Posted August 21, 2014 Author Share Posted August 21, 2014 (edited) WE OFFICIALLY HAVE A NEW PRODUCT ! Places are still opened for the second batch. The product will be officially added to the 4x4design catalog in September. Thanks to everyone who made this possible ! S. Edited August 21, 2014 by fleurys 3 Link to comment Share on other sites More sharing options...
01Pathmaker Posted August 21, 2014 Share Posted August 21, 2014 Here's a push for you guys. I have the AC skid plate for the front. Was pretty much given to me. It's 3/16" steel. It is freaking HEAVY! So much, that I dread dropping it to change my oil filter. So, for those of you on the fence. Grab this while you can. If your worried about cost. Here's my perspective. A sheet of 1/4" alum the size to make this is about $90 where I live. Then you have to find someone with a metal brake to make the bends, and hope you get them right. Then you have to spend the time to drill the holes. Which being slotted will make installing this super easy. (Compared to having to hold up 50lbs and hope you get the bolts started enough and fast enough with the heavy AC one). Finally you have to get it powder coated. Which will be $75+ and hope that the powder coater is doing a run. Otherwise you'll wait for it. Most wont do a single oven run just for a small skid like this. This is a good deal. Jump on it!! Definitely great info, thanks! I'll probably jump in on the second run. Link to comment Share on other sites More sharing options...
kdj Posted August 21, 2014 Share Posted August 21, 2014 (edited) Way to go Fleurys and to the first 6. I think it's great that you are not only doing this for business reasons but for the Nissan community, Now if you could stamp out some sheet metal for the R50 rear wheel well arches, I've got two trucks in need and my sister has one as well, plus I have a neighbour and.......oh well we can't have everything. Keep up the good work. Kevin Edited August 21, 2014 by kdj Link to comment Share on other sites More sharing options...
351cleveland Posted August 21, 2014 Share Posted August 21, 2014 Put me down for one of these bad boys! Much needed. Thanks! Link to comment Share on other sites More sharing options...
fleurys Posted August 21, 2014 Author Share Posted August 21, 2014 Put me down for one of these bad boys! Much needed. Thanks! pm sent. S. Link to comment Share on other sites More sharing options...
rickb01 Posted August 23, 2014 Share Posted August 23, 2014 Looks like a quality product. Just sent you an e-mail to join your 2nd batch group =) Link to comment Share on other sites More sharing options...
sroeser01 Posted August 23, 2014 Share Posted August 23, 2014 ill be interested in the second batch! Link to comment Share on other sites More sharing options...
fleurys Posted August 23, 2014 Author Share Posted August 23, 2014 ill be interested in the second batch! Please send me your infos at steve_fleury3-AT- yahoo.com (name, shipping address, email address for paypal invoice and daytime phone number.) Thanks. S. Link to comment Share on other sites More sharing options...
fleurys Posted August 29, 2014 Author Share Posted August 29, 2014 ** Only 3 spots left for the 2 first batches. Shipping expected to be mid-september. Reserve you skidplate ! ** 3 days left for the end of the pre-sale. Link to comment Share on other sites More sharing options...
fleurys Posted August 30, 2014 Author Share Posted August 30, 2014 ill be interested in the second batch! Sent you 2 private messages... Shows as not read.. Let me know if you want to reserve your skidplate or not... Tks S. Link to comment Share on other sites More sharing options...
ferrariowner123 Posted August 30, 2014 Share Posted August 30, 2014 When would expect a payment for the remaining amount? I'm really considering this, talk me into it. -Kyle Link to comment Share on other sites More sharing options...
ferrariowner123 Posted August 30, 2014 Share Posted August 30, 2014 Convincing done, sign me up. lol -Kyle Link to comment Share on other sites More sharing options...
fleurys Posted August 30, 2014 Author Share Posted August 30, 2014 (edited) When would expect a payment for the remaining amount? I'm really considering this, talk me into it. -Kyle The last payment will need to be done when they are at the powder coating station (just before shipping). That would be in 1-1.5 week from now. Edited August 30, 2014 by fleurys Link to comment Share on other sites More sharing options...
ferrariowner123 Posted August 31, 2014 Share Posted August 31, 2014 Man, i got all excited and then realized i have to wait.... just kidding, i can wait....i hope. haha -Kyle 1 Link to comment Share on other sites More sharing options...
Mehbenn Posted September 3, 2014 Share Posted September 3, 2014 Any idea when second batch will be shipped out also thinking about purchasing this Link to comment Share on other sites More sharing options...
fleurys Posted September 3, 2014 Author Share Posted September 3, 2014 Any idea when second batch will be shipped out also thinking about purchasing this Both batches will ship at mid september.. I'm fabricating 12 of them for the first shipment. Envoyé de mon iPhone à l'aide de Tapatalk Link to comment Share on other sites More sharing options...
Mehbenn Posted September 3, 2014 Share Posted September 3, 2014 Pm sent Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now